132kV / 33kV Primary Transmission Substation

Kilinochchi, Northern Province • Completed 2020

132kV / 33kV Primary Transmission Substation

Engineering Overview

Major provincial power grid infrastructure project strengthening regional electricity stability in Sri Lanka's Northern Province, connecting local 33kV distribution networks directly to the 132kV national grid backbone.

The Challenge

Logistical transportation of heavy 63MVA transformers across regional bridges and installation during extreme monsoon conditions without soil subsidence.

The Engineering Solution

Engineered reinforced piling foundations, specialized hydraulic multi-axle trailer transport, and automated oil purification degassing systems on-site before energization.

132kV / 33kV Primary Transmission Substation installation

Key Scope & Technical Deliverables

  • 2 x 63MVA 132/33kV power transformers with on-load tap changers
  • Outdoor air-insulated switchgear (AIS) gantries and surge arresters
  • 132kV SF6 gas circuit breakers and motor-operated disconnectors
  • Fiber-optic SCADA gateway interfacing with national dispatch centre
  • Deep earth electrode well systems achieving < 0.5 Ohm earth impedance

Project Results & Impact

Grid Reliability Reduced regional transmission losses by 14%
Beneficiaries Enhanced power reliability for over 180,000 consumers
Project Quick Facts
  • Client National Transmission Network
  • Location Kilinochchi, Northern Province
  • Category power
  • Completion Year 2020
  • Contract Duration 16 Months